标签: KOSUN

  • How to Do Daily Maintenance on Vacuum Degasser?

    READ: It is necessary to install a vacuum degasser for their removal from the drilling fluids since the invading gases may impact mud properties, cause safety risks and affect the lifespan of some equipment. Vacuum degasser has found wide application in drilling fluids circulating system.

    It is necessary to install a vacuum degasser for their removal from the drilling fluids since the invading gases may impact mud properties, cause safety risks and affect the lifespan of some equipment. Vacuum degasser has found wide application in drilling fluids circulating system, forcing the gases(such as, CH4, H2S, etc.) out of entrained drilling fluids(mud) so that mud properties(including density, viscosity) are well preserved.

    Techniques to Extend Lifespan of Vacuum Degasser:

    1. When the vaccum degasser is rolling, it is necessary to check its vacuum gauge all the time and adjust vacuum degree between 0.03~0.05 to ensure the normal operation.

    2. The rotor and suction pipe inside vacuum chamber should be washed clean after the machine is used. Then cut off the electricity, unload the blind(i.e. the oval blind flange), examine the condition of parts, remove the foreign odjects and wash clean the inner wall and rotor with high-pressure water pipe.

    3. Weekly cleaning should be performed on the head cover of vacuum chamber to keep dirty stuff from blocking gas passage. The gas collector and bubble separator on head cover can be washed by clean water. While doing these, unconnect the vacuum pipelines, undo the pipeplug and gauge stand, then insert high-pressure water pipe for 3-5 mins each time.

    4. The aforementioned cleaning should be carried out every time when drilling work is completed so as to ensure the normal operation for next time.

    5. Lubricate the spindle bearing with 250-300mL grease every other month.

    6. As far as vaccum pump is concerned, its bearing should be under frequent examination to keep its temperature, after being lubricated, 15-20 degrees higher than the ambient temperature. When it is above 30℃, vacuum gauge should be watched constantly, water in gas/liquid separator replaced promtply and the water temperature kept under 35℃.

    7. In wintertime, immediately discharge the standing water inside gas/liquid separator and pump as the precautions of possible frost crack. After vacuum pump is dismantled and repaired, please note the concentricity of coupling.

     

  • Functions of Mud Agitator in Solids Control System

    READ: KOSUN WNJ Drilling Mud Agitator, as a tank equipment in solids control system consisted of reducer and explosion-proof electric motor, has got dominant application in mud mixing and concoction. It is easy to keep up, and suitable to operate in terrible outdoor working conditions.

    KOSUN WNJ Drilling Mud Agitator, as a tank equipment in solids control system consisted of reducer and explosion-proof electric motor, has got dominant application in mud mixing and concoction. It is easy to keep up, and suitable to operate in terrible outdoor working conditions. Its large agitating strength can extend to a large scale of drilling fluids and greatly reduce resisting moments when it starts. Drilling mud agitator is mainly consisted of explosion-proof electric motor, reducer, base and impeller module, with its electric motor and reducer, reducer and impeller shaft connected via solid coupling. Welded by four blades, its impeller generates turbulent motion in drilling mud to double the agitating effects. The plate surrounded by blades prevent solids from gathering together around lower blades, reduce resisting moments against blades and avoid burning the electri motor during overload startup process.

    Drilling Mud Agitator works continuously and reliably in drilling fluids to keep it even and its solid particles suspend. As a major constituent of harmful solid phase, drill cuttings should be suspended and injected into desander, desilter and centrifuge before being taken away. At the same time, useful solid phase, such as, various weighted materials (ground hematite, ground barite) and slight bentonite should also stay in even suspension to stabilize the mud density and other mud properties. Accordingly, it is required that mud agitator should work reliably and continuously if no precipitation is expected.

    Mud agitator mainly mixes and concocts drilling fluids for the purposes of stopping the solid particles from precipitating in tank circulating system and maintaining stable mud properties as well as even concoction. Agitation is very significant in accelerating the reaction, dissolution and wetting of drilling fluids materials(such as, bentonite, barite) and chemical agents. And it also enlarges the contact area of phase interface for the reason of quickening the interaction between two phases.

     

  • Solids Control Equipment to Complete Mud Circulation

    READ: Fluid circulating system has been frequently mentioned in previous passages surrounding solids control technology, and are to be more illustrated in this one. The circulaing process is completed when the drilling fluids circulates through hydrocyclone desander, mud desilter, vacuum degasser and decanter centrifuge, through the discharge manifold in solids control module to mud pump, through its water lines into the centrifugal pump.

    It is known that drilling processes are: fluid-purification process, fluid circulating process, mud dosing process, mud concocting process, mud weighting process, automatic irrigating process, etc. Amongst them, fluid circulating system has been frequently mentioned in previous passages surrounding solids control technology, and are to be more illustrated in this one.

    The centrifugal pump, arranged inside mud cabin, suctions cleaned mud with the aid of injection pump. The drilling fluids travels out under the high pressure of AC variable frequency centrifugal pump, through dual high pressure pipelines to vertical pipe valve group standing on the drill floor after the divergence via valves in mud cabin, through the double tribble, hose, upper driving device(or swivel), inner chamber of drillstring to drill bit in the well hole. Then, the high-pressure drilling fluids jets into the well bottom and carries solid phase back to wellhead via the annular space between drillstring and casing pipes, out from the horn mouth under the turntable, through the mud pipelines below drill block to the horizontal mud cabin, and through the verticle mud cabin and the treatment of shale shaker into the tank. Afterwards, the circulaing process is completed when the drilling fluids circulates through hydrocyclone desander, mud desilter, vacuum degasser and decanter centrifuge, through the discharge manifold in solids control module to mud pump, through its water lines into the centrifugal pump.

     

  • 2014 KOSUN Annual Meeting: Another Milestone in KOSUN Developmental History

    READ: On Jan 18th, KOSUN Annual Meeting in 2014 & Launching Ceremony of ES-KSN Environmental Engineering and Equipment Co., Ltd. opened the prelude in the banquet hall on the 3rd floor of Titan Central Park Hotel, Xi’an, China.

    On Jan 18th, KOSUN Annual Meeting in 2014 & Launching Ceremony of ES-KSN Environmental Engineering and Equipment Co., Ltd. opened the prelude in the banquet hall on the 3rd floor of Titan Central Park Hotel, Xi’an, China.

     

    Photo of Mr Geng Feng, the general manager of KOSUN and his employee in front of signature wall
    Photo of Mr Geng Feng, the general manager of KOSUN and his employee in front of signature wall
     
     
    Ms Naella from ES Company signs her name on signature wall
    Ms Naella from ES Company signs her name on signature wall.
     

    At the Eve of Spring Festival, Xi’an KOSUN Machinery Co., Ltd. delicately prepared this visual extravaganza for all the staff who have devoted their wisdom and talents into development of the Company, celebrating the most significant traditional festival in China altogether as well as the achievements made in the bygone year.

    Through the colletive efforts in the last year, KOSUN made another remarkable success by reaching an agreement to establish a multi-national joint venture co-invested with Environmental Solutions Inc. from Egypt.

    Mr Tarek, the chairman of ES Company and his team were invited to attend this annual meeting, which at the meantime was aimed to witness the signing ceremony between two parties that had reached consensus on co-investment in the newly-found joint venture—ES-KSN Environmental Engineering and Equipment Co., Ltd..

     

    Mr Tarek addresses the annual meeting.
    Mr Tarek addresses the annual meeting.
     
     
      The leaderships from both ES Company and KOSUN cut the ribbons.
    The leaderships from both ES Company and KOSUN cut the ribbons.
     

    On the event, Mr Geng Feng, general manager announced the start by giving a grateful and welcome address, which was followed by a range of festive art performance geared up by KOSUN staff from different departments, interluded by lucky draws done by three honorable guests. Afterwards, it was drawn a full stop with best performance awards issued and group photos taken between the leadership and staff.

     

    “Legend of Concubine Zhen Huan” performed by staff from Gaoxin Office of KOSUN
    “Legend of Concubine Zhen Huan” performed by staff from Gaoxin Office of KOSUN
     
     
    Dance “Danger” performed by KOSUN staff
    Dance “Danger” performed by KOSUN staff
     
     
    Ms Naella from ES Company gets the lucky draw for second prize
    Ms Naella from ES Company gets the lucky draw for second prize
     
     
    Chorus “Tomorrow will be better” performed by staff from Gaoxin Office of KOSUN
    Chorus “Tomorrow will be better” performed by staff from Gaoxin Office of KOSUN
     

    KOSUN is on the way to become an international company, and is making a great effort to develop the global market, in order to accomplish the transformation from traditional marketing to the networked marketing and accomplish the strategic change to an enterprise aiming at both of international and domestic market instead of only relying on local market.

    In order to plumb the new markets and business fields, KOSUN reached a consensus with ES Company in Egypt to build a China leading service enterprise in drilling waste management- ES-KSN Environmental Engineering and Equipment Co., Ltd., jointly funded by both parties, which also will further extend the industrial chains.

     

    Group photo between the leaderships and the excellent employees
    Group photo between the leaderships and the excellent employees

     

  • KOSUN Joins Hands with ES; ES-KSN Joint Venture Started

    On Jan. 18th, 2014, ES-KSN Environmental Engineering and Equipment Co., Ltd. (ES-KSN for short), jointly funded by ES and Xi’an KOSUN Machinery Co., Ltd., was formally founded. It is aiming at providing drilling waste management services and R&D, manufacturing and marketing of solids control equipment and waste management equipment, and further extending KOSUN’s industrial chain.

    Signing Ceremony between Two Leaderships from KOSUN and ES Company
    Signing Ceremony between KOSUN and ES

    At the founding ceremony, Mr. Geng Feng, general manger of Xi’an KOSUN Machinery Co., Ltd. and Mr. Tarek, representative of ES signed the contract and addressed respectively. “Now, KOSUN is on the way to be an international company, and make great efforts to develop the global market, in order to accomplish the strategic transformation from traditional marketing to the networked marketing and from only relying on the local one to aiming at both international and domestic markets. By reason of exploring new market and boosting larger sales, we reach a consensus with ES to jointly establish ES-KSN Environmental Engineering and Equipment Co., Ltd., a China’s leading service enterprise in drilling waste management, to further extend the KOSUN’s industrial chain”.

       Mr. Geng Feng, general manager of Xi’an KOSUN Machinery Co., Ltd., addresses the ceremony.
    Mr. Geng Feng, general manager of Xi’an KOSUN Machinery Co., Ltd., is addressing the ceremony.

    ES-KSN has developed two business categories: R&D, manufacturing and marketing of solids control equipment and waste management equipment; waste management engineering services, and has devoted to the integrated development of equipment and engineering services as well as provision of first-class equipment and excellent services for all oilfields.

    Mr Tarek, representative from ES Company, addresses the ceremony.
    Mr Tarek, representative from ES Company, is addressins the ceremony.
    Ribbon-cutting Ceremony
    Ribbon-cutting Ceremony

     

  • KOSUN Starts New Company–ES-KSN

    ES-KSN Environmental and Engineering Co., Ltd.(short for ES-KSN)is a joint venture co-founded by ES Company and KOSUN.

    ES-KSN Environmental and Engineering Co., Ltd.(short for ES-KSN)is a joint venture co-founded by ES Company and KOSUN. Established at Gaoxin District of Xi’an in January 2014, ES-KSN has developed twp business modules, of which one extend to R&D, manufacture and marketing of solids control equipment and waste management equipment, the other waste management engineering services, and has devoted to the integrated development of equipment and engineering services as well as provision of first-tier equipment and excellent services for all oilfields.

     

    Signing Ceremony between ES Company and KOSUN
    Signing Ceremony between ES Company and KOSUN

    In the modern society, it has become a trend to employ drilling fluids for drilling operations. Despite of the consequent huge benefits, it remains a necessity to well address the issues arising from it. Vertical Centrifuge, a new product put into market in 2014 by ES-KSN, is able to resolve the issues and prevent oil companies from large amount of spending on drilling fluids.

     

  • Efficiency Analysis on Solids Control Equipment Removing Harmful Solid Phase

    READ: It is necessary to carry out regular efficiency analysis of solids control system in drilling site in orde to improve drilling fluids properties and better manage the cost. Generally speaking, the aggregate drilling fluids consumption in a well counts 10 to 20 times the volume of a borehole.

    It is necessary to carry out regular efficiency analysis of solids control system in drilling site in orde to improve drilling fluids properties and better manage the cost. Generally speaking, the aggregate drilling fluids consumption in a well counts 10 to 20 times the volume of a borehole. That means 90% of the expenses are poured into volume and property maintenance of the additionally concocted 90% drilling fluids. However, it can give birth to remarkable economic benefits if solids control equipment is promptly adjusted to remove more “harmful solid phase”.

    The efficiency analyses conducted on different equipment show that, theoretically speaking, all of them should have been taken away, but in fact only 80-85% or even lower amount of them have been removed and 90% would have been the best. It is also shown that, by a deeper study into separation capability of various solids control equipment and size distribution in such useful solid phase as barite and harmful solid phase(low-density particles), desander and desilter are not ideal choices to treat barite-weighted drilling fluids, but the decanter centrifuge can decrease the low solid phase gradually accumulated in any type of drilling fluids.

    “Communique on Drilling Fluids Treatment Equipment” well elaborates the standard application methods and analysis approaches of various solids control equipment, for example. drilling fluids shale shaker ought to be analyzed in terms of its solids removal rate, cuttings removal rate and drilling fluids loss ratio; desander, desilter and drilling fluids decanter centrifuge ought to be analyzed in terms of solids removal percentage, low-density solid phase discharge velocity and barite discharge speed; the decanter centrifuge also need to be calculated on its barite recovery percentage, etc.

    Besides, another formula can also work on the calculation of solids control efficiency, such as, if the figures like, dilution volume per unit time, the formation volume and the max. cuttings content got from solid phase analysis are given, we can have the efficiency rate of solids control equipment.

     

  • KOSUN ZJ70 Solids Control System Ordered by ZPEC Delivered on Dec 29th

    READ: On Dec. 29th, KOSUN ZJ70 Solids Control System offered for ZPEC was packed and put into delivery in Yongle Circulating System Factory. It has already been ordered by the end of September.

    On Dec. 29th, KOSUN ZJ70 Solids Control System offered for ZPEC was packed and put into delivery in Yongle Circulating System Factory. It has already been ordered by the end of September.

     

    Delivery site
    Delivery site

    Headquartered in Lujiazui Finance & Trade Zone of Shanghai, Zhongman Petroleum and Natural Gas Group Co., Ltd. ( ZPEC ) is an oil & gas enterprise aiming to set up a multi-national energy company. Its main business scope contains oil drilling rig & equipment production, drilling engineering services, geologic examination, international trade, petroleum and natural gas exploration & development, construction of vehicle natural gas filling stations, technical services, etc.

     

    Packing site
    Packing site
      
    Equipment ready to leave
    Equipment ready to leave
     
    Delivery site
    Delivery site

     

  • KOSUN Products to Display on Beijing CIPPE 2014

    READ: Again, Xi’an KOSUN Machinery Co., Ltd. is about to participate in CIPPE in 2014 with its exhibition area covering 350 m²; and its stand number to be E2160.

    Again, Xi’an KOSUN Machinery Co., Ltd. is about to participate in CIPPE in 2014 with its exhibition area covering 350 m²; and its stand number to be E2160.

     
     

    CIPPE, as a regular meeting of the international petroleum and petrochemical industry, is the high-quality exhibition verified by the Union of international Fairs, that is UFI for short and is held in Beiing in Spring and in Shanghai in Autumn.

    Xi’an KOSUN Machinery Co., Ltd., “KOSUN” for short, was originally named as Xi’an Changqing Drilling Equipment Factory and Xi’an KOSUN Oil Drilling Equipment Co., Ltd.. KOSUN is mainly capable of producing such four series as oil & gas drilling solids control equipment, centrifuges, drilling waste treatment equipment and drilling security equipment, including 25 categories of products, and can also customize packaged design and matching products of oil & gas drilling rigs for drilling contractors. The products provided by KOSUN are extensively used in oil & gas drilling and workover, coalbed methane drilling, shale gas drilling, water well, geothermal well drilling, trenchless horizontal directional crossing projects, mine gravel staged treatment, tailings treatment, rive dredging works, municipal environment-friendly sewage treatment, industrial wastewater treatment, fruit juice purification, waste oil recovery and purification treatment, etc.

     

  • Some Things to Consider When Designing Drilling Fluids

    READ: Drilling fluids design is of great importance for drilling engineering design, factoring complication analysis in neighboring wellbore and complication prediction of the well in question, types, major parameters and basic ingredients of drilling fluids for different depths, mud circulating system configuration and application requirements.

    Drilling fluids design is of great importance for drilling engineering design, mainly determined by lithology, strata pressure, pshysicochemical properties of shale formation,.formation fluid, cross section of formation pressure(pore pressure, collapse pressure and fracture pressure), geothermal gradient, etc.; and restrainted by reservior protection requirements, complication in completion wells of local and neighboring blocks and drilling fluids application, geographical and drilling engineering requirements, relevant drilling mud technologies and techniques, state and regional environmental regulations.

    Principles of Drilling Fluids Design:

    1. It should be done on drilling geological design, drilling engineering design, other relevant materials as well as concerned technological standards, regulations and norms.

    2. After analysis of influential elements to exploration safety quality and economic benefits, some drilling fluids technological measures should be drawn out.

    Drilling fluids is designed with:

    1. Complication analysis in neighboring wellbore and complication prediction of the well in question;

    2. Types, major parameters and basic ingredients of drilling fluids for different depths;

    3. Material planning and capital budget of drilling fluids for different depths;

    4. Mud consumption prediction;

    5. Reservior protection requirements;

    6. mud circulating system configuration and application requirements;

    7. Requirements on mud testing apparatus’s configuration;

    8. Drilling fluids concoction and management;

    9. Requirements on contingency materials and kill fluids reserves;

    10. Prediction and dealing of borehole complications;

    11. Requirements on HSE management.