KOSUN Successful Cases in Recent Years

Subway Construction Work Mud Environment-friendly Treatment Site Guangdong – China From 2017 to 2018, KOSUN Environmental Black Rhino KD-500 slurry separation equipment was used in underground diaphragm wall construction of double wheel trench cutter in the Guangdong Subway Project, China. The maximum capacity of the equipment was up to 500m3/h and the separation size was 30~40m. The high handling capacity and high-quality recycled mud guaranteed the rapid tunneling of double wheel trench cutter. Moreover, the unique two and three-staged separation switching technology made the equipment easily meet the construction requirements of different stratums. Drilling Oil-base Mud Treatment Site – Russia In 2017, KOSUN Environmental cryophylactic mud solids control system was applied in the oilfie

KOSUN Successful Cases in Recent Years Read More »