- Home
- Products
-
-
Solids Control Equipment
- Linear Motion Shale Shaker
- Decanter Centrifuge
- Mud Cleaner
- Vacuum Degasser
- Centrifugal Pump
- Shear Pump
- Submersible Slurry Pump
- Mud Agitator
- Mud Gun
- Jet Mud Mixer
- Desilter
- Water Tank
- Mud Tank
- Diesel Tank
- MD210 Drilling Mud Cleaner
- Balanced Elliptical Motion Shale Shaker
- Oilfield Drilling Mud Desander
-
Solids Control System
- Drilling Mud Cooling System
- Solids Control System
- Mobile Solids Control System
- Arctic Solids Control System
-
TBM
- Tunnel Boring Mud System
-
HDD
- HDD Mud Recovery System
-
-
- News
- Services
- Marketing
- About Us
- Contact Us
- Videos
Home > KOSUN News >
Phase-Ⅱ of Kazakhstan-China Gas Pipeline Starts Welding
Sep 10, 2008
On September 6th, phase-II of Kazakhstan-China Gas Pipeline started welding. Launching ceremony was held on the construction site in Turkistan City, Southern Kazakhstan Oblast.
Kazakh Deputy Prime Minister Shukeyev read a congratulatory letter from Kazakh President Nursultan Nazarbayev. Chinese government representative Liu Tienan, who is Deputy Chairman of National Development and Reform Commission and also chief of National Energy Administration, Minister of Energy and Mineral Resources of Kazakhstan Sauat Mukhametbaevich Mynbayev, KazMunayGas President Kairgeldy Kabyldin, CNPC Vice President Mr. Wang Dongjin, Governor of Southern Kazakhstan Oblast Askar Myrzakhmetov, delivered speeches at the ceremony respectively. PetroChina Vice President Mr. Sun Bo was also present at the ceremony.
The 1,475-kilometer pipeline starts from Beyneu, Mangghystau and will meet the Central Asia-China Gas Pipeline at Shymkent. Designed annual capacity of the pipeline is 10 billion cubic meters, and can be expanded to 15 billion cubic meters.